- Joined
- Jul 27, 2019
- Messages
- 13,092
- Location
- Midlothian, VA
- RV Year
- 2017
- RV Make
- Newmar
- RV Model
- Ventana 4037
- RV Length
- 40' 10"
- Chassis
- Freightliner XCR
- Engine
- Cummins 400 HP
- TOW/TOAD
- 2017 Chevy Colorado
- Fulltimer
- No
I wasn't aware of specials when I ordered my coach, maybe a good thing, maybe not but one thing I wish I could have done better with is the floor tile choice. The porcelain tile is not my favorite and it can be very slick to a dog as my prior dog was terrified of them so I had to use a runner of top of them. I inquired with Newmar about getting the floor redone during winter rates (Jan - Mar) as I figured it can't be that much. As expected, the floor tile and grout is around $3k which is fine with me. The labor on the other hand is estimated at 200 hours. I am curious what the actual time required would be. Not sure what is involved but that runs the bill at 115/hr to nearly $27K which is not something I am willing to do. I could either take the risk and hope for much less time required and go for it, or red alert avoid avoid, way too much risk of monster money.
Anyone know what's really involved and why 200 hours of labor and if that's realistic?
Anyone know what's really involved and why 200 hours of labor and if that's realistic?