Welcome to RVForums.com

  • Register now and join the discussion
  • Friendliest RV Community on the web
  • Modern site for PC's, Phones, Tablets - no 3rd party apps required
  • Ask questions, help others, review campgrounds
  • Get the most out of the RV Lifestyle
  • Invite everyone to RVForums.com and let's have fun
  • Commercial/Vendors welcome

Newmar 2022 Orders, Specials, Deliveries

Welcome to RVForums.com

  • Register now and join the discussion
  • Modern secure site, no 3rd party apps required
  • Invite your friends and let's have fun
  • Commercial/Vendors welcome
  • Friendliest RV community on the web
big

I reached out to my dealer this morning, he informed me that the December delivery date is holding, Once the unit gets on the assembly line he will have a hard date for delivery barring any material or equipment shortages.

Will see......keeping my fingers crossed.....

Tony
Great news. It will be the slight chassis difference I think but hey, nice Christmas present. Once the vin is issued you can apply to the Newmar 'newagle', the owners part which I understand holds all your RV info, diagrams etc. wish you all well with it :)
 
big

I reached out to my dealer this morning, he informed me that the December delivery date is holding, Once the unit gets on the assembly line he will have a hard date for delivery barring any material or equipment shortages.

Will see......keeping my fingers crossed.....

Tony
Hey great new, must be the slight difference the chassis delivery from Ford. But great Christmas present.

If you don't already know this, once your VIN is issued to your unit you can apply to Newmars 'Newgle' owners site. I think this hold all your specific build specs, manuals, diagrams etc.

 
Hey FL Steve, congratulations, wonderful unit. Would be interested to know how that initial date turns out. Its still a moving object but hopefully it turns out within those guideline dates. I ordered a BS3401 just on 2 months ago (NIRVC also) before the rush for price increases, so dates were further out, but I am trying to get a better guess now things have settled. As your on the FL chassis (I assume) there may be more availability, but I understand a lot of the same parts on the habitation unit are long back ordered.

Will be nice to learn when production starts for you...... good luck
Thanks @BigMC ... will post any updates as I get them. I am on a Spartan chassis as that is all it comes on.

FLSteve
 
If it helps, I'm in Run 12 with an ETA out of production initially on Oct. 7th and now on Oct. 13th. I'm told that Newmar is telling everyone that it could be 2-3 weeks late if they end up needing parts.
 
that means Run 20 -- -my place in line, just slipped. Thankfully, I knew this going in.
 
@redbaron ... can explain what the run # means??

FLSteve
 
@redbaron ... can explain what the run # means??

FLSteve
The production is scheduled with a number of chassis to enter production as a batch or "Run #". This a mix of all brands, from BS to KA.

We know from the tours, that multiple chassis are built and staged prior to production. We also know that Floors are built, and laid on the chassis prior to production, but these are all queued up in the same "run #". There is a defined period of time where "Run #x" will start in the chassis shop, and flow thru all the way to final inspection.

Most of us are given a date of "Out of production" which is the date this batch will be finalized with inspection.

We do not know how many days of buffer are built in, but I suspect the buffer days are very small...less than 1 day.

So a delay in parts that affects the entire run, or a day where no one shows up for work, will delay the current RUN as well as all subsequent runs. I have heard that the run from start to finish is 21 days. That means that Renee's run 12 is about to start. It is probably already in the stage where VIN#'s are assigned, and components are being ordered and staged for the production. Once it enters production, delays will be minimal.

There are 8 more runs before mine, so add 1 day per run, and that delays me 1 week additional to what already happened to Renee.

What I do not know is what determines the beggining of a run count vs an end. Is it a fixed # of units (ie: 20 units per run) or is it more detailed, where each run consists of "2 BS, 4 CS, 4 VT, 10 DS, 1 NA, 2 LA, 1 EX, 1 KA"...something along those lines. I don't think newmar has ever disclosed that level of detail.
 
Thanks @redbaron. This was exactly what I was looking for. I think I have a general understanding of how this works now. I had always heard folks talk about run numbers but never really understood what they meant.

FLSteve?
 
Just saw at the other place people scheduled in Run 9 are delayed with new estimated completion date of Oct. 18th.
 
Just saw at the other place people scheduled in Run 9 are delayed with new estimated completion date of Oct. 18th.
Those where BS/CS coaches right? I saw a few of those. They are being moved to a lot waiting on furniture.
 
Those where BS/CS coaches right? I saw a few of those. They are being moved to a lot waiting on furniture.
Two of them were CSs and by their posts it sounded like they were delayed in starting production. One of the posts indicated that "weld day" was scheduled for August 26th (I'm thinking the 27th) and that had been delayed for 2 weeks so should start Monday: however, they posted it 9/8 so possibly it could be a furniture issue? She only mentioned they were delayed because of parts. The other poster did not know why or what was causing their delay.

EDIT: Correction: 1 KS, 1 CS. Makes more sense though for furniture delay than whole line delayed. Thanks @redbaron for the info.
 
Last edited:
Holy smokes! I may have some photos of my coach on the line coming soon. I'm so excited and nervous. Meanwhile, here is what I ordered:

2022 London Aire 4551

Custom Paint w/ Linen Tweed Girard Awnings
Glacier Glazed Matte Cabinets
Sirocco Interior
All electric, induction, 8 AGM Bat
Dishwasher
Monitor on Passenger Side (one of the dogs will like it)
Winegard Auto Open Face Sat Dish
Euro Booth
Sleep Number Bed
LED lights under ODS Slideouts
Stainless Trim
Kitchen Window
RV Sanicon Turbo
Manual Tray Storage (Bays 3 and 4)
Ottomans
Exterior 43" TV in sidewall

Then the fun stuff (Specials):

1631898945787.png

Fireplace on ODS with Televator (sidewall end window to remain) w/ 1 recliner
Omit ODS OHC Cabinets over fireplace and dinette
Relocate Sound Bar and A/V
King Aire Floors with beige rubber strip
Substituted Leather “A” to Leather “B” on ceiling treatments
Geneva Wallboard
Geneva shower tile
Essex Countertops
New Aire Kitchen Backsplash
New Aire Mid Bath and Rear Bath Backsplash Tile
Essex Style headboard
DSDP Dual Bowl Solid Surface in Kitchen
Add 12v in cockpit OHC above drivers seat
Trifold Sofa Ilo Jack Knife Sofa
GE Advantium vented to exterior wall
Add 12v to left of steering wheel between the cupholders and toggle switches
Add 110v in rear Closet next to ADJ shelves
Run conduit from roof to front cockpit OHC above drivers seat
Ship soap dispenser loose
 
Holy smokes! I may have some photos of my coach on the line coming soon. I'm so excited and nervous. Meanwhile, here is what I ordered:

2022 London Aire 4551

Custom Paint w/ Linen Tweed Girard Awnings
Glacier Glazed Matte Cabinets
Sirocco Interior
All electric, induction, 8 AGM Bat
Dishwasher
Monitor on Passenger Side (one of the dogs will like it)
Winegard Auto Open Face Sat Dish
Euro Booth
Sleep Number Bed
LED lights under ODS Slideouts
Stainless Trim
Kitchen Window
RV Sanicon Turbo
Manual Tray Storage (Bays 3 and 4)
Ottomans
Exterior 43" TV in sidewall

Then the fun stuff (Specials):

View attachment 8894
Fireplace on ODS with Televator (sidewall end window to remain) w/ 1 recliner
Omit ODS OHC Cabinets over fireplace and dinette
Relocate Sound Bar and A/V
King Aire Floors with beige rubber strip
Substituted Leather “A” to Leather “B” on ceiling treatments
Geneva Wallboard
Geneva shower tile
Essex Countertops
New Aire Kitchen Backsplash
New Aire Mid Bath and Rear Bath Backsplash Tile
Essex Style headboard
DSDP Dual Bowl Solid Surface in Kitchen
Add 12v in cockpit OHC above drivers seat
Trifold Sofa Ilo Jack Knife Sofa
GE Advantium vented to exterior wall
Add 12v to left of steering wheel between the cupholders and toggle switches
Add 110v in rear Closet next to ADJ shelves
Run conduit from roof to front cockpit OHC above drivers seat
Ship soap dispenser loose
Dramatic changes, color scheme wise, both inside & out from your original DS. Much lighter, correct?
 
Natalie from Newmar sent me some photos of my coach on the line today. So exciting, although I'm not sure they are putting the correct kitchen sink in.?? Anybody know what All Dish Fire means?

0C0442E8-E971-48AE-BA58-1DEE6DE2A008.jpeg
00DE5CD7-1970-4F80-A29A-1114B79E5FB2.jpeg
BD8B2E07-D7AC-4805-A13B-5394FBB18A64.jpeg
F2F62B60-C0F0-4AF8-A5E6-C8E522DF7E94.jpeg
5B9B31C8-5B88-4EF8-9641-E04A60AB1BBF.jpeg
156DBF39-94E4-4FC0-9D4D-8CE9578F7069.jpeg
 
@ARD , that sink sure looks like the stainless sink in my DS.
 
5CB92737-76F0-4CE8-9E94-FA1A6087295F.jpeg
On further review, I’m not sure what the heck that is. I would think the sink would have been installed by this point.

This pic is from the first batch I rec’d from her. It clearly shows the sink installed.
 
I would think the sink would have been installed by this point.
So maybe it's something lying on top of the sink? ? I'll be getting more photos on Monday. Meanwhile I texted Natalie to make sure. Thanks for taking a look.
 
Does not look like SS sink to me. Looks correct.
 
So maybe it's something lying on top of the sink? ? I'll be getting more photos on Monday. Meanwhile I texted Natalie to make sure. Thanks for taking a look.
That’s what I’m thinking.
 

Latest posts

Latest resources

Back
Top