Welcome to RVForums.com

  • Register now and join the discussion
  • Friendliest RV Community on the web
  • Modern site for PC's, Phones, Tablets - no 3rd party apps required
  • Ask questions, help others, review campgrounds
  • Get the most out of the RV Lifestyle
  • Invite everyone to RVForums.com and let's have fun
  • Commercial/Vendors welcome

FYI Solar 101 - A General Guide to Solar in your RV or Motorhome

Welcome to RVForums.com

  • Register now and join the discussion
  • Modern secure site, no 3rd party apps required
  • Invite your friends and let's have fun
  • Commercial/Vendors welcome
  • Friendliest RV community on the web
Ih my gosh! Thanks for the info! I have a 20’ rig, not a lot of room up there. The roof is difficult to clean, as it is. I could out hinges in frame to lift. I live in the forest and I just know a branch or heavy limb will land in it. Thoughts?
 
My 26ft fifth has a 20ft box the rest over the hitch. I have 1000w over the box only. I look for spots in the forest that are clear of trees. I don't park under the shade of trees, what is the point if solar is the game.
 
Thanks for the writeup and the offer to answer questions. Here are my initial questions:

While I think I’m competent enough to do the install myself, I’m interested in taking the coach somewhere and just having it done in a day or so. I reached out to AM Solar, but given that they are on the West Coast and we haven’t made it out that way yet due to having other commitments that limits the time we have to travel that far at our slow pace, I’m wondering if you’ve found any competent RV Solar companies in Virginia or surrounding states?

Newmar’s solar prep includes a blue cable with RJ45 connectors that goes from the basement to the cabinet above the driver. Did this cable get used?

Related to the above question, does the MPPT have a remote monitoring capability that would be installed inside the coach?

I noticed that the MPPT has a LED indicting which charging mode (ie. bulk, absorb, float) it is in. Does the MPPT get this info from the inverter/charger so that it can adjust the output voltage accordingly?

Is there such a thing as installing too much solar capability? It would seem that it would be cheapest to install the most panels at the time that the initial installation was being done. Is there a downside?

Let’s start last question first. Not really. A solar panel, when exposed to sunlight is like having a battery. More solar panels equals more batteries. Aside from cost and weight...there is no downside to having MORE. You aren’t likely to fit so many on an RV that you will hear anyone say...”I think I have too much.” Never heard anyone say that, yet.

The solar charge controller is Independent of the Inverter/Charger. Well...if you have a Magnum MS inverter and add a Magnum PT-100...they do talk to a common remote...and share settings. But think of the Solar MPPT controller as an independent thinking device. It looks at battery voltage and charges accordingly. If there is something already charging, when the controller wakes up at daybreak...it may idle in Float mode...and let the other charger go at it. If it wakes to less voltage...it will go thru BULK, ABSORB, and FLOAT, which may cause the other charger to idle in FLOAT, Standby, Silent, etc...as it’s programming is set. If you apply a large load...and both chargers see a dip in voltage...they may both hit the party by going back to BULK at the same time. You really don’t have to worry about it too much. It all happens automatically, once set for the correct charge parameters.

Some inexpensive controllers are stand alone. And you have to see the settings/readings on the unit. Others have a remote panel display. The option many take is the Victron SmartSolar series. It has built-in Bluetooth... You download the free Victron Connect app for your device...pair the two...and now you have a very intuitive display. You set, control, monitor, and even update firmware....all from your phone or tablet. I don’t want to put the cart too far ahead of the horse...but Victron devices can also be linked a few different ways. VE.direct is a proprietary cable. If you connect your Solar Controller to a GX device by VE.direct cable...such as Venus GX or Cerbo GX...and you have the GX connected wirelessly/or wired to an internet router/hub. You now have the ability to monitor and manage your solar from anywhere in the world, it is called VRM or Victron Remote Management. If you have your rig stored somewhere else...it sure is nice to be able to check in. It can also be set to give you email alerts to any condition you care to be alerted to. I monitor mine mainly from the VRM portal...and have an iPAD mini mounted to my A-pillar and can see the display while driving. More for fun...or running high loads like an AC unit.

You can add a remote to the cabinet with the solar option RJ cord...but if you go with Victron SmartSolar...it’s kinda a big step backward. The Victron app is easier to read, interpret, and control. A remote display means you have to stand and bend your neck. Reach up. Cycle thru multiple tiny display pages...and toggle up/down repeatedly to adjust settings. After using Victron Connect...the remote will feel like the stone ages.

I understand that having someone else do it adds convenience. If you have all the parts and tools...good weather...and assistant...you can knock the job out in two days. One day on the roof...mounting panels, running wires, adding combiner box, and connecting to the solar prep.
The other day is spent in the basement...mounting switches, breakers, controller, wires, fuse...and battery terminations. Actually, doing the basement first is better...because you will not Have to worry about loose ends when you start applying solar PV energy. It isn’t a difficult task. There are positive and negative wires...you’ll have to cut, strip, and crimp terminations on wires...apply colored heat shrink for a neat job. From the mounts (I used AMSolar) to the wire terminations...there are step by step video instructions on AMSolars website or YouTube. Beside saving yourself a lot of labor expense...having a first hand knowledge of your system will pay dividends. Instead of having a system plopped into your lap...you’ll have most likely read and reread the manuals before and during installation. When done...you actually know what the readings are telling you. If something isn’t up to par...you know where stuff is and where to look for connections, components. There will be no mystery. I‘m not recommending anyone get up on the roof, if it isn’t something they feel safe doing. You have to be careful. It can expose you to a fall hazard. So, please don’t bite off more than you are comfortable with...just because I promote self-installation. Only you know if this falls within your personal comfort zone.

Most of us joke...after installing the system ourselves we say...”Now I know why it’s so expensive to have one installed”. You’ll get a workout...no doubt. But, it is a rewarding experience and really gives you a detailed insight into the working of your system.

Sorry for being long winded. Ask questions...we all did...as the first thing you build is the system in your mind. After you get it built completely in your mind...you will be able to build the physical system on your coach.
 
Last edited:
BTW...the “Victron Connect” App is free...and you can launch it in simulation mode. Select the type of solar controller you would like to view and you can become familiar with the settings and options without even purchasing a charge controller. All of the Victron manuals are available free online as well. I reviewed the manuals for both of the charge controllers I was considering before purchasing. The Manual for the Magnum PT-100 has some excellent worksheets for determining amp rating for breakers and wiring. I recommend downloading it even if you do not purchase a PT-100 solar charge controller.

The Victron controller I have is the Victron SmartSolar MPPT150/100-TR... As the name implies...it can handle 150v PV input...and it will output up to 100A of charge.
 
Charlie - Thanks for the detailed response. It really helps in understanding the capability, especially the part about the MPPT being a charger and the coach’s two chargers (MPPT and Xantrex SW3012) working in parallel. I hadn’t thought of it that way.

I previously purchased a BMV-712, but haven’t yet installed it. I had looked at connecting it to my SmartHome capability via a VE.Direct RS232 cable so that I can remotely monitor its data in addition to all the stuff available on the RV-C network. I’ll probably continue to look into this and include the MPPT as well. I prefer having control of my own data/system instead of relying on a cloud service, but will utilize a cloud service when it’s best to do so.

As I get older, getting on roofs is not something I look forward to. Especially the transition from the ladder to roof and vice versa. I just remembered that my brother recently purchased on of those scissor jack lifts like they have at the Newmar Service Center. That would definitely make the install more comfortable, thus perhaps I can do the install myself.

I understand that the solar prep includes two 6 AWG (?) wires to take the solar panel power to the basement installed MPPT. I understand that there is a limit as to how many amps can flow over the wire and the solution to providing more solar power watts to the MPPT is to increase the voltage begin carried over the wire either by using higher voltage panels or by connecting several panels in series (similar to how the coach’s 6V batteries are wired). Do I understand this correctly? Is there an ideal voltage? I assume the limitation will be based on the MPPT input voltage capabilities?

Thanks
 
Scissor lift? In my dreams!!! Getting the panels up on the roof was the biggest hurdl.

The 6AWG works great. Early adopters were heck bent on parallel wiring of a bunch of 12v 100w panels. If I am not mistaken...AMSolar and Marvin Braun (PrecisionRV.com) were fans...and added thick cables from the roof to the basement. They have each diversifield since.

Yes...the 6AWG has it’s limitations, and as you point out...setting the panels in a series-parallel configuration will keep you within the amperage limits. I do not know the exact cutoff point..but at some voltage you go into “high voltage” category. In the solar industry...high voltage requires additional safety labels and manual shutoff switches...so I didn’t want to go there either.

Here’s a link that shows different configurations and formulas for calculating the theoretical voltage and amperage for choosing wires and fuses...


In a perfect world/perfect day...1,000 watts per meter sq. sun intensity...I would yield 1,440 watts (8 x 180watt panels). The math worked out nicely...if your batteries absorb setting is around 14.4v...1,440watts will give you 100A of current. My Interstate batteries recommend just a bit below that... ( C/10, or 92.8A). I wired my panels in four strings of two... So, each pair are wired in series...and each string of two are combined in parallel. It’s a balance. MPPT controllers love voltage...they wake up much faster with two panels in series...and can start working. The controller will have a recommended minimum voltage for best power point tracking. I advised another friend...he went with the Magnum PT-100 controller. I used the then current guidance in the Magnum Manual. They later found out the minimum voltage for their controller is higher than they originally thought. The controller works...but throws out an error code...which basically says the voltage is too low to compute maximum power point. I would recommend three panels in series for that controller based on the latest guidance...vs. two in series. During a high output point...I see somewhere around 1,200 watts...and the PV voltage is around 42v...and around 28A going down the 6AWG solar prep wire. The same gauge used in your cord reel to carry up to 50A. I believe the insulation they used on this solar prep wire is rated much higher than 50A...can’t remember what the amperage was that I found..but needless to say it is leaps and bounds more than 28A.

The way we use our coach...we have the minimum I would recommend. The atmosphere doesn’t always give you a full count of wattage. Having a residential refrigerator, microwave, espresso machine....we LIKE power. Seems a few of the high end installs lately have been closer to 2000watts and parallel charge controllers. Might fit on a 45’ coach nicely ?...

I do like not worrying about power outages, or being able to boondock and not running the Generator a huge amount. I also never worry about coming out to dead batteries. I‘m sure you are already onboard as to the advantages.

The 6AWG is great for what I have. If you were designing a system for 2,000 watts and parallel controllers...then two sets of 6AWG would have been my choice for solar prep.

The BMV-712 that you purchased can pair with certain SmartSolar charge controllers. They use proprietary VE.Smart (BLE) communication. With an optional temperature sensor designed for the BMV-712...the sampled voltage and temperature are relayed to the SmartSolar charge controller. If using Lead Acid chemistry...this is most beneficial as it give you more precise compensation of charge parameters based on battery temperature. LiFePO4...I gather uses no such temperature compensation...but can use the temperature in other ways....such as cutting off solar charge if the batteries get too cold.

I am a big fan of Victron solar products...
 
Last edited:
The 6AWG is great for what I have. If you were designing a system for 2,000 watts and parallel controllers...then two sets of 6AWG would have been my choice for solar prep.
There is only to small a wire. The larger the better. If your wire is much above ambient temp you would better have been served with larger wire. Heat is lost power. use your IR thermometer. I have 4 wires coming from the roof, two for each controller in the rig. My MPP is 55 volts.

High voltage according to the NEC2017 is 100+ volts. under that is low voltage. The call of NEC2017 is for an E-shutoff switch that emergency responders have access to. In the past 48 volts was the limit at that voltage NEC had a say if the state adopted it. There is still the "preexisting work " for older systems.
 
There is only to small a wire. The larger the better. If your wire is much above ambient temp you would better have been served with larger wire. Heat is lost power. use your IR thermometer. I have 4 wires coming from the roof, two for each controller in the rig. My MPP is 55 volts.

High voltage according to the NEC2017 is 100+ volts. under that is low voltage. The call of NEC2017 is for an E-shutoff switch that emergency responders have access to. In the past 48 volts was the limit at that voltage NEC had a say if the state adopted it. There is still the "preexisting work " for older systems.

Thank you for those details. I couldn’t remember what the voltage and safety cutoff requirements were/are...and haven’t stayed abreast of the latest.
 
So I’ve been trying to figure out some of the basic specs for the panels and the controller.

While I need to procure and install the panels and controller, there are several components that I already have. Those being the AGM batteries, Xantrex SW3012 inverter, AND the 6 AWG solar prep wires from the roof to the basement compartment.

Here are some thoughts. I’m looking for feedback to see if I’m think about this correctly.

My thought is that I want to develop a plan on how I would max out the solar capability. Whether I implement it now or incrementally over time.

It would seem that one of the implementation limitations will be the 6 AWG wire. Looking online, I find that a 6 AWG wire is limited to 55 amps (various based on temperature). If I were to install 12V panels in parallel, the output would be limited to roughly 660 watts (55A * 12V). Obviously I would want more capability than this. If the 12V panels were installed in a series of two and then each series in parallel, the 6 AWG wires could support approximately 1320 watts. That’s much better and in line with numbers that I’ve read in various posts.

I suppose I could combine the panels in a series of four to yield 48 volts and the 6 AWG wire could support unto 2640 watts. That sounds really nice! Am I understanding this correctly?

Also, it seems like panels are available in various voltages to include 12V, 24V, and 48V. If the input to the controller is going to be 48V, would it best to installed 4 12V panels in series, 2 24V panels in series, or just 48V panels. My understanding is that these would be options.

I also have a questions on selecting a MPPT controller, but I’ll post that latter as this post is probably long enough.
 
You need to use the data plate numbers from your desired panels. They will have Isc (Short Circuit Current)...and Voc (Voltage Open Circuit)...a 12v panel isn't putting out 12v... It appears you were estimating wattage based on 55A x 12V...doesn't work that way. I believe I linked a source pdf which details the computations...and application of safety factors...
 
Last edited:
@Neal

When you installed the panels on the roof did you add fuses between the panels and the combiner box?

In your picture the fuse beside the MPPT solar controller - Is that a 100A fuse?
 
Last edited:
@Neal

When you installed the panels on the roof did you add fuses between the panels and the combiner box?

In your picture the fuse beside the MPPT solar controller - Is that a 100A fuse?
Yes I did and later removed them. You'll never know when one fails or in my case my crimps not being done good enough. AMSolar no longer uses them, I cut all of my out.
 
i have a 2002 Coachmen Class A motorhome. it currently has a 30amp shore power service with an Onan generator.
i want to add solar to be able to power the 120v service and charge the aux solar battery.
what inverter do i need to use and how do i tie it into the current coach inverter? can i still use the stock power panel and inverter?

i am doing this on the cheap. i have:
100w Harbor Freight solar panels and controller
Renogy Rover 30 Amp 12V/24V MPPT Solar Charge Controller
2 on/off toggle switches
a 3000w inverter
added 1 AGM battery

panels are mounted on the roof with the wires coming down the refrig vent.
 
Last edited:
Hard to say without knowing your setup, but why not just have your solar controller charge your house batteries. Solar is really just a battery charger….and then you use that stored power to run what you want (basically). You also did not say how much solar you have.

And why not use the inverter you have? 3000 watts is very adequate.
 
i have a 2002 Coachmen Class A motorhome. it currently has a 30amp shore power service with an Onan generator.
i want to add solar to be able to power the 120v service and charge the aux solar battery.
what inverter do i need to use and how do i tie it into the current coach inverter? can i still use the stock power panel and inverter?

i am doing this on the cheap. i have:
100w Harbor Freight solar panels and controller
Renogy Rover 30 Amp 12V/24V MPPT Solar Charge Controller
2 on/off toggle switches
a 3000w inverter
added 1 AGM battery

panels are mounted on the roof with the wires coming down the refrig vent.
Your my kind of person (on the cheap). We do have a different opinion of "on the cheap" however.

First things first! I would not run wires in a plenum (hot air vent cavity).

What I think you are asking is:
What do I need to do to power my house circuit on the cheap?
So this is the answer.
Disconnect the 110 vac wires from the converter. (Having the converter in the 110 circuit creates a loop).
Either run the power cord directly to the inverter, or wire an outlet from the inverter to the rv cord storage location so you can plug the coach in at that location. .
Hook up the charging system as defined in the solar controller paperwork.
Oversized wires are standard for solar. The controller should be as close to the batteries as is possible, and share the same temperature, not the same compartment.

One final point! DO NOT MIX AND MATCH BATTERY TYPES, OR DIFFERENT BATTERY SIZES! ALSO ALL BATTERIES SHOULD HAVE MANUFACTURED DATES WITHIN 6 MONTHS OF EACH OTHER. The old will destroy the new.
 

Latest resources

Back
Top