Welcome to RVForums.com

  • Register now and join the discussion
  • Friendliest RV Community on the web
  • Modern site for PC's, Phones, Tablets - no 3rd party apps required
  • Ask questions, help others, review campgrounds
  • Get the most out of the RV Lifestyle
  • Invite everyone to RVForums.com and let's have fun
  • Commercial/Vendors welcome

2022 Newmar London Aire 4551 - RedBaron Build

Welcome to RVForums.com

  • Register now and join the discussion
  • Modern secure site, no 3rd party apps required
  • Invite your friends and let's have fun
  • Commercial/Vendors welcome
  • Friendliest RV community on the web
2012 related thread
 
2012 related thread
Yup....same worry I had back with my 2013 coach. Learned a lot from that delivery. The procedures I outlined prevented any corrosion.
 
Thanks for describing preventative action . Regards
 
This triggered a thought for me as I plan to spend two months in Florida in January and February. It might be wise to wash the undercarriage to prevent corrosion from salt air since we will be near the ocean at one stop. I really liked this tool that someone posted in a thread.

Undercarriage Cleaner for Pressure Washer, Under Carriage Power Washer Attachment with 45 Degree Angled Wand, 4 High Sprayer, 1/4 Quick Connect and Swivel Caster Wheel, Underbody Pressure for Car Wash https://www.amazon.com/dp/B0854557S6/?tag=rvf01-20
 
@redbaron ... read the 3rd paragraph in the following post. I guess I need to find out if NIRVC Atlanta has a coach washing procedure for winter delivery ... as I will be after you it appears due to the 12.5 kw generator delay.

FLSteve :unsure:

 
@redbaron ... read the 3rd paragraph in the following post. I guess I need to find out if NIRVC Atlanta has a coach washing procedure for winter delivery ... as I will be after you it appears due to the 12.5 kw generator delay.

FLSteve :unsure:

I doubt they do, but it may not be an issue if your much later. My coach is expected to exit production at the peak of winter mix potential. By getting a factory delivery, I am delaying 6 weeks and should be in ideal weather.

I would assume that all NIRVC service facilities follow the same script, as this is part of their training for consistency. So pay attention to your run #.
 
Deal is Signed. Deal is Done. Waiting for Newmar to respond to my specials.

Here is the summary of my order:

London Aire 4551
Custom Paint
Glazed Maple Matte Cabinets
All electric
Dishwasher
Extra Monitor
Rear Camera Prep for Stacker
Euro Booth
Sleep Number Bed
LED under ODS slides
Stainless Trim
Kitchen Window


Now for the specials:
  • Flooring: KG22-102 laid in KG style ILO Std
  • Backsplash: DS22-280 backsplash ILO Std in kitchen
  • Backsplash: DS22-280 backsplash ILO Std in mid bath

    View attachment 7832
  • Shower Floor: LA22-511 floor tile ILO Std
  • Ceiling: LA22-531 Leather “B” on ceiling ILO Std
  • Cab Seats: LA22-531 Fabric “A” on front seat piping ILO Std (seats all one color)
  • Equal Depth Cabinets over sofa and euro booth
  • No Nail head on furniture
  • No Nail head on bedroom headboard
  • Master Bathroom Medicine cabinet – adjustable shelving ILO fixed (both shelves)
  • DS 4369 Dresser in Master Bedroom ILO Std
  • Add 2 adjustable shelves in both sides of Dresser in master bedroom and keep hanging rack
  • Add LED lighting in bedroom wardrobe cabinets so lit when open
  • Std size passenger seat ILO wide seat in cab area
  • Solid door into bedroom ILO of reeded glass
  • Vented egress window in bedroom

    ELECTRIC
  • Add 110 Volt with USB in master closet to the right of the shoe shelf half way down
  • Add 110 V with USB Med Cabinet in rear bathroom (std in 1 so just adding the other side)
  • Add 110V with USB behind drivers seat (if can’t be done with USB then just a regular 110V)
  • Add 110V with USB the the left side of valance by dining room window
  • Add 110V in electrical bay on the left side if looking at it
  • Add 110V (NON INVERTED) in Bay 2 door side to share with freezer bay circuit
  • Add 110V Freezer Bay dual outlet ILO single outlet
  • Add 110V non inverted outlet in kitchen under microwave towards cabinet side (opposite power leg/phase of microwave)
  • Add 12V in Driver OH Cabinet (non ignition controlled)
  • Conduit from driver overhead cabinet to roof
  • Conduit from driver overhead cabinet to media cabinet
  • Conduit from electrical bay to half bath electrical cabinet
  • Conduit from half bath electrical cabinet to roof
  • Add half tray slider in Bay 3 on the door side

    APPLIANCES
  • GE Advantium Microwave ILO Std
  • Vent microwave to the exterior
Did they approve the vented dresser window over standard one. I know you asked for 4369 dresser layout.
 
Did they approve the vented dresser window over standard one. I know you asked for 4369 dresser layout.
That's a good question! I have no idea which window I am getting. Didn't even ask.
 
The 2022 year started out with my coach entering Building 7 on 1/3/2022. Construction is well underway. Natalie was kind enough to send me some photos of the progress so far.
100_4997.JPG100_4998.JPG100_4999.JPG100_5000.JPG100_5001.JPG100_5002.JPG100_5003.JPG100_5004.JPG100_5028.JPG100_5029.JPG
 

Latest resources

Back
Top